IMPACTO DE LA METODOLOGÍA BIM 5D EN LA PLANIFICACIÓN, CONTROL DE COSTOS Y COORDINACION INTERDISCIPLINARIA DE UN CENTRO DE CONVENCIONES EN MACHALA
| dc.contributor.author | JAYA QUEZADA JOHN ANGEL | |
| dc.contributor.author | SANCHEZ AREVALO ANIBAL ANDRES | |
| dc.date.accessioned | 2025-11-18T16:56:08Z | |
| dc.date.available | 2025-11-18T16:56:08Z | |
| dc.date.issued | 2025 | |
| dc.description | Este estudio examina el efecto de la metodología BIM 5D en la organización, supervisión de gastos y cooperación entre disciplinas en el diseño de un centro de convenciones en Machala. La iniciativa surge para abordar la necesidad de mejorar la eficacia en la administración de proyectos estatales, donde a menudo aparecen gastos adicionales, retrasos en los plazos y falta de integración entre las áreas técnicas. Mediante la creación de un modelo BIM que incluye las dimensiones 3D (diseño), 4D (tiempo) y 5D (costos), y la elaboración de un Plan de Ejecución BIM (BEP) adaptado al entorno municipal, se ilustra cómo esta metodología puede mejorar los procesos desde las fases tempranas del proyecto. La investigación se potencia a través de encuestas destinadas a expertos del campo y una validación técnica a través de modelos paramétricos. Los hallazgos señalan progresos significativos: una mayor exactitud en las proyecciones y estimaciones, detección temprana de disputas y un incremento en la cooperación entre diversos sectores. | |
| dc.description.abstract | This study examines the effect of the 5D BIM methodology on the organization, expense monitoring and cross-disciplinary cooperation in the design of a convention center in Machala. The initiative arises to address the need to improve efficiency in the administration of state projects, where additional expenses, delays in deadlines and lack of integration between technical areas often appear. By creating a BIM model that includes the 3D (design), 4D (time) and 5D (costs) dimensions, and developing a BIM Execution Plan (BEP) adapted to the municipal environment, it illustrates how this methodology can improve processes from the early phases of the project. Research is enhanced through surveys aimed at experts in the field and technical validation through parametric models. The findings point to significant progress: greater accuracy in projections and estimates, early detection of disputes, and increased cooperation between various sectors. | |
| dc.identifier.uri | https://repositorio.uees.edu.ec/handle/123456789/4987 | |
| dc.language.iso | es | |
| dc.subject | Integración | |
| dc.subject | optimización | |
| dc.subject | precisión | |
| dc.subject | eficiencia. | |
| dc.title | IMPACTO DE LA METODOLOGÍA BIM 5D EN LA PLANIFICACIÓN, CONTROL DE COSTOS Y COORDINACION INTERDISCIPLINARIA DE UN CENTRO DE CONVENCIONES EN MACHALA | |
| dc.type | Thesis |